Scaffolding

The Heet scaffolding system is based on the design principle of combining three prefabricated high quality basic components (i.e.Main frame, Cross brace, Joint pin.) with a carefully researched assembly technique.Compared with other quick assembly scaffolds, Heet system offers great advantages due to its fast and easy assembling. Component quality is checked and ensured for each item.

Content Image

Advantages

Rationalizes storage and transport.
Limited number of light-weight individual components.
Easily handled with logical step by step assembly sequence.
Time saving erection of scaffolding on the most complicated sites and structural shapes.
Greater labor efficiency with one man assembly.
High quality material and robust design means longer life.
Highly economical.

Content Image

Components of assembling. Main Frame

The main frame is erected with the help of cross bracing member. There is no need for pull-resistant connection of vertical frame (main frame) because they are locked in position due to selflocking pins connection, which decisively rationalize the connecting technique. Pivot pins are welded to the vertical frames cannot be lost.

Content Image